Skip to content

What you need to do to make a new screen work

 - What you need to do to make a new screen work

Follow these steps to make LED screens work.

The first step is to open the package

You may receive a package that looks like this when you receive the LED screen

 - What you need to do to make a new screen work

(Packing a flight case)

 - What you need to do to make a new screen work

(Packed in wooden boxes)

 - What you need to do to make a new screen work

(Packing in cartons)

Take out the LED screen panels by opening it.

Normally, we pack accessories separately, like power cables, data cables, spare modules, media players, etc. Find them before installation.

Step 2. Install the LED panels

Connect LED panels with side locks or plates one by one.

The power cable and the data cable should be connected between the panels

 - What you need to do to make a new screen work

Step 3: Connect the control system

Connect the power box P200/P300 to the power source and the screen

 - What you need to do to make a new screen work

Each power cable connecting panel to panel is 2.5m2, and the maximum load is 5KW, so please don’t connect panels together more than the maximum load per power cable.

Connect the media player to the screen and to the internet

 - What you need to do to make a new screen work

4.Login and control

To login, use Chrome browser, log in from sostron.com, and you should have a username and password

Leave a Reply

Your email address will not be published. Required fields are marked *

× How can I help you?